Dewatering and Grouting Operations

Numerous construction projects necessitate digging beneath the existing groundwater level, which calls for dewatering and grouting measures. Dewatering involves reducing and managing the groundwater to create stable and dry conditions suitable for construction activities. Grouting operations complement dewatering by filling voids and stabilizing soil, which solidifies the subterranean environment to prevent water ingress and enhance structural integrity. To control groundwater, various methods are employed, including WellPoint systems, surface-level pumping sumps, and deep wells equipped with submersible pumps.

Previous
Previous

Piling and Shoring Foundation, and CFA Piles

Next
Next

Microtunneling